Oman Metal Industries provided the engineering, manufacture, installation and commissioning of seventy eight, 100 MMBTU/Hr. Once Through Steam Generators (OTSG), for the Mukhaizna Steam Flood Project. Designed to provide 99.95% separation efficiency, the control system automatically adjusts the fuel - water ratio parameter to keep steam quality at 80% at all operating levels.
50 MMBTU/Hr. Steam Generator Relocation - Amal
(OTSG) Relocation from Fahud to Amal
To increase steam production capacity by over 2000 tons per day, Four 50 MMBTU/Hr. Once Through Steam Generators were dismantled and relocated from Fahud to Amal. Following renovation, recertification, control upgrade at OMI's Muscat facility, the steam generators were transported 1062 kilometers to the Amal Field for final installation and commissioning.
One of Eleven 100 MMBTU Heat Recovery Steam Generators
OMI Received a contract for the design, fabrication, delivery and installation of eleven 100 MMBTU/Hr. Once Through Steam Generators (OTHRSG's) to supply electrical power and steam generation for a heavy oil plant at Mukhaizna. The (OTHRSG's) were water-tube type suitable for continuous operation in conjunction with a single gas turbine, fueled solely by natural gas and designed for minimum operating attention and maintenance with a useful operating life of 30 years.